# Short #87 - Our Install Reminders

> Episode of [HVAC School - For Techs, By Techs](https://podistic.com/podcast/hvac-school-for-techs-by-techs.md) · Published January 21, 2020 · Duration 12:30

- **Listen on Podistic:** https://podistic.com/episode/short-87-our-install-reminders
- **Audio:** https://traffic.libsyn.com/secure/hvacschool/Short_87_-_Out_Install_Reminders_.mp3?dest-id=425611 (audio/mpeg)

## About this episode

This short episode is a review of a list of installation reminders made by Kalos manager Jeff Crable. Kalos is doing a bunch of these installs for a commercial customer. Hopefully, the business leaders can take a few things from our checklist and help out their installers.

Whenever we do an install for our large commercial customers, we give our installers a long checklist of reminders; that way, they can do the best install possible.

Some of those install reminders include:

*   Don't rush the details.
*   Ensure the drain line is clean, pitched correctly, trapped, ventilated, and insulated.
*   Install float switches in the unit and auxiliary pan. Wire in series and test.
*   Replace the auxiliary drain pan or ensure that it's in good condition and has proper sizing.
*   Hang the auxiliary drain pan WITH Unistrut; don't hang with wire.
*   Install a new thermostat.
*   Attach and hang the ductwork properly; silver-tape will NOT support duct board plenums.
*   Replace incorrectly sized breakers (for licensed electrical contractors only).
*   Replace old and faulty disconnects (for licensed electrical contractors only).
*   Ensure that the outside conduit is watertight or replaced.
*   Anchor condensers properly with isolators if the pad is attached to the building foundation.
*   Mark the unit with the correct number using paint and stencils or vinyl stickers.
*   Post pictures of the units and data tag in the appropriate location in our communication software; make detailed notes.
*   Address vertical air handlers and take them as they come.
*   If a unit is in a difficult area, try moving to a more accessible place if you can.
*   Pour gallons of water into the drain pan and observe draining. Listen for noises of concern.
*   All work will be checked by lead techs or managers. Get everything right the first time if you want a full bonus.

######  

Learn more about Refrigeration Technologies [HERE](https://www.refrigtech.com/).

If you have an iPhone, subscribe to the podcast [ HERE](https://itunes.apple.com/us/podcast/hvac-school-for-techs-by-techs/id1155660740?mt=2), and if you have an Android phone, subscribe [HERE](http://www.stitcher.com/podcast/bryan-orr-3/hvac-school).
